Key takeaways

  • Each entry needs client, scope, contract value, period, and a measurable outcome; two lines maximum.
  • Three entries is the right number on a one-page statement, chosen for relevance rather than size.
  • Lead with the outcome, not the activity; contracting officers are scanning for evidence you delivered.
  • With no federal history, use commercial or subcontract work and say plainly what role you held.

The past performance section is the part of a capability statement that decides whether a contracting officer keeps reading. Everything else on the page describes what you say you can do; this is the only block that shows you have done it.

It is also where most one-page statements waste the most space, because applicants write paragraphs where they should be writing two lines.

What one entry needs

Five components, every time:

  1. Client: the agency, prime contractor, or organization.
  2. Scope: what you actually delivered, in the buyer's language.
  3. Value: contract or project value.
  4. Period: dates, or duration.
  5. Outcome: something measurable that resulted.

The fifth is the one that gets dropped, and it is the one that matters. A contracting officer already assumes you performed the scope; they are looking for evidence of how well.

Worked examples

Three entries, in the format that fits a one-page statement:

U.S. Department of Veterans Affairs: Contract 36C10X22D0041 Transition case management for 1,400 separating service members across three regions. $2.1M, 2023 to 2025. Achieved 94% enrollment within 30 days of referral against a 85% target; contract extended twice.

Prime: Halstead Federal Services (subcontract) Curriculum design and instructor delivery for HHS workforce training, 22 cohorts. $340K, 2024 to 2025. Completion rate 91%; participant assessment scores averaged 4.6/5.0.

Ohio Department of Job and Family Services Outreach and eligibility screening for 6,200 households in eleven counties. $780K, 2022 to 2024. Reduced average screening-to-determination time from 19 days to 7.

Note what each entry does in two lines: it names a verifiable client, states scope in terms a buyer recognizes, gives a number for size, and closes on a result with a figure attached.

Note also the second entry. It states plainly that the work was a subcontract under a named prime. That is not a weakness to conceal; it is normal, verifiable, and far better than an entry phrased to imply prime status that a five-minute check would contradict.

Choosing which three

Relevance beats size, consistently.

A $340,000 contract delivering precisely the scope the buyer is procuring outperforms a $4 million contract in an adjacent field. Contracting officers are matching your history against their requirement, not ranking vendors by revenue.

So the entries should change. A capability statement is not one document; it is a template you retarget. When you approach a different agency, swap the entries for the three most relevant to them, and adjust the scope language to mirror their terminology. Our capability statement template is built to be re-cut this way.

Recency matters too. Within three years is the usual expectation, and many solicitations say so. Older work can appear if it is unusually on-point, but a statement whose best example is from 2019 invites the question of what you have been doing since.

Writing outcomes when you do not have clean metrics

Not every project produces a percentage. The alternatives, in rough order of strength:

  • Renewal or extension. "Contract extended twice" is a client verdict.
  • Scale delivered. "1,400 participants across three regions" establishes capacity.
  • Schedule and budget. "Delivered on schedule and 4% under budget."
  • Recognition. A CPARS rating, a formal commendation, a named award.
  • Client statement. A short quoted line, attributed.

What does not work is restating the scope as though it were an outcome. "Provided case management services" tells the reader nothing they did not learn from the scope clause immediately before it.

With no federal past performance

This is the common situation for first-time federal sellers, and the honest approach is also the effective one.

Use what you have. Commercial contracts, state and local work, nonprofit programs, and subcontracts all belong here, in the same five-part format. Contracting officers are assessing whether you can deliver the scope, and a well-documented commercial contract does that.

State your role accurately. Subcontractor, teaming partner, prime, say which. Ambiguity that flatters you is the fastest way to lose credibility, because federal buyers verify.

Do not invent or inflate. Past performance is checkable through CPARS and direct reference calls, and a discovered exaggeration ends the relationship rather than the pursuit.

Build toward it deliberately. Subcontracting under an established prime is the standard route into federal past performance, and one completed subcontract changes the section entirely. Register in SAM.gov, make sure your NAICS codes are right, and pursue teaming before pursuing primes, see Grants.gov registration and the SAM UEI for the registration groundwork.

Where it sits on the page

Past performance is the third of the five standard blocks: company overview, core competencies, past performance, differentiators, company data. Give it roughly a quarter of the page, enough for three tight entries and no more.

If it is running long, the entries are written as prose. Compress each to client, scope, value, period, outcome, and the space problem resolves itself.

For the whole document, see how to write a capability statement and our fill-in capability statement template. For the federal application forms this work leads to, start with the SF-424.

About the author

Daniel Rourke, MPA

Federal & Government Grants Specialist

Daniel came up through the public sector and holds a Master of Public Administration, so federal paperwork holds few surprises for him anymore. He knows the Grants.gov workbench, the quirks of the SF-424 family, and the parts of 2 CFR 200 that quietly sink applications. His goal with every piece he writes is to spare applicants the avoidable mistakes that cost them a deadline.

Frequently asked questions

What is a capability statement example?+

A one-page document with five blocks: a short company overview, core competencies, past performance, differentiators and company data including your Unique Entity Identifier, CAGE code and NAICS codes. Past performance carries the most weight, and each entry names the client, scope, value, period and a measurable outcome.

Is past performance a required evaluation factor?+

It is frequently used, though not universally required. Many federal solicitations name past performance as an evaluation factor and reference records such as CPARS. Even where it is not formally scored, contracting officers and prime contractors use it to screen vendors, which makes it decisive in practice.

What are some examples of capabilities?+

Capabilities are the specific services you deliver, written in the buyer's language rather than yours. Examples include transition case management, curriculum design and instructor delivery, outreach and eligibility screening, or systems integration. Mirror the terminology of the agency or opportunity you are targeting.

What should be included in the performance work statement?+

A performance work statement is the buyer's document rather than yours, describing required outcomes and standards instead of methods. Your capability statement should answer it by showing past work matching those outcomes, with the client, scope, value, period and a measurable result for each entry.

What if I have no federal past performance?+

Use commercial, state, local or nonprofit work in the same format, and state your role plainly including where you were a subcontractor. Contracting officers care more that you can deliver the scope than that you have held a federal prime contract. Inventing or inflating experience is far more damaging than having little.

Ready to win your next grant?

Get a flat-fee quote from a certified grant professional. No commission, no guesswork, just a funder-ready proposal.